Design & Installation of Precast Concrete Drainage Systems

Loading Events

« All Events

  • This event has passed.

Design & Installation of Precast Concrete Drainage Systems

March 30, 2017 @ 8:00 am - 4:40 pm

Presented by the Illinois Concrete Pipe Association
Thursday, March 30, 2017, 8:00 AM – 4:40 PM
Hyatt Regency, Lisle, Illinois

Special Keynote Speaker –Dr. Patricia Galloway

Speaking on the Roles, Responsibilities & Risk Considerations of the 21st Century Engineer – Presentation

Other Presentations Include:
Accelerated Construction Using Precast Concrete Boxes & Three-Sided Structures Steve Smart, County Materials Corporation
Every Day Counts – Market Ready Options

Design Comparison of RCP & Plastic Pipe – Oliver Delery, P.E., Forterra Pipe & Precast
A Guide to 23 CFR 625 Requirements for Culverts & Pipe – PPT
Plastic Fill Height Table Pitfalls
The Thermoplastic Pipe Profile Predicament
Trust But Verify
Water Table Concerns for Storm Drains and Culverts
Flexible and Rigid Pipe Installation Review and Discussion
The Importance of the Gradation of Sands With Respect to Structural Backfill Support for Plastic Pipe
A User’s Guide: Adhering to Federal Regulation 23CFR625 in the Design of Buried Culverts

Proper Installation of Concrete Pipe & Boxes –Oliver Delery, P.E., Forterra Pipe & Precast
Precast Box Culvert Installation Procedures

Please click here for registration form.

Details

Date:
March 30, 2017
Time:
8:00 am - 4:40 pm
Event Category:

Venue

Hyatt Regency
1400 Corporetum Dr
Lisle, IL 60532 United States
+ Google Map
Phone:
(630) 852-1234