Presented by the Illinois Concrete Pipe Association
Thursday, March 30, 2017, 8:00 AM – 4:40 PM
Hyatt Regency, Lisle, Illinois
Speaking on the Roles, Responsibilities & Risk Considerations of the 21st Century Engineer – Presentation
Other Presentations Include:
Accelerated Construction Using Precast Concrete Boxes & Three-Sided Structures – Steve Smart, County Materials Corporation
Every Day Counts – Market Ready Options
Design Comparison of RCP & Plastic Pipe – Oliver Delery, P.E., Forterra Pipe & Precast
A Guide to 23 CFR 625 Requirements for Culverts & Pipe – PPT
Plastic Fill Height Table Pitfalls
The Thermoplastic Pipe Profile Predicament
Trust But Verify
Water Table Concerns for Storm Drains and Culverts
Flexible and Rigid Pipe Installation Review and Discussion
The Importance of the Gradation of Sands With Respect to Structural Backfill Support for Plastic Pipe
A User’s Guide: Adhering to Federal Regulation 23CFR625 in the Design of Buried Culverts
Proper Installation of Concrete Pipe & Boxes –Oliver Delery, P.E., Forterra Pipe & Precast
Precast Box Culvert Installation Procedures
Please click here for registration form.